To generate a VMware Workload report
- Click the Reports tab.
- Click VMware Workload on the left menu.
- Select the date / time range on which you want to report.
- Select desired report options.
- Select the element or groups of ESX servers that you want to report on.
- Select the report output type.
- Choose Generate Now or schedule the report to be generated at a later time.