To generate a VMware Workload report

  1. Click the Reports tab.
  2. Click VMware Workload on the left menu.
  3. Select the date / time range on which you want to report.
  4. Select desired report options.
  5. Select the element or groups of ESX servers that you want to report on.
  6. Select the report output type.
  7. Choose Generate Now or schedule the report to be generated at a later time.
  • No labels